Signal stops
at the wall.

RFID shielding paint for any building.
Tested before and after.

Inside the room Beacon Shielded wall Two shielding coats plus a finish coat No read beyond it Next room, next tenant, the street Inside the room Beacon Shielded wall Two shielding coats plus a finish coat No read beyond it Next room, next tenant, the street

Read range ends where the coating starts.

300+
Sites in the current programs
30,000+
Sq ft coated and documented
Multinational
Rollout experience

Stray reads are
bad data.

A tag read through a wall does not just show up in the wrong place. It corrupts the count, trips the wrong alert and teaches the system something untrue.

Inventory that lies

Stock in the back room reads as if it is out on the floor. On hand counts drift, replenishment fires late, and staff quietly stop trusting the number on the screen.

Security that cries wolf

Reads from the next room, the next tenant or the sidewalk look like movement inside your own four walls. Alarms get ignored, and the real one gets ignored with them.

Zones that overlap

Two readers claim the same tag and the location logic starts guessing. Everything downstream that depends on knowing where a thing sits guesses along with it.

Sales floor Back room thin section floor reader back room reader
Sales floor Back room thin section floor reader back room reader
read as sales floor read as back room counted in the wrong place
Sales floor12 / 8
Back room4 / 8
In the wrong zone4

The floor shows 12 in stock when 8 are out there. Replenishment never fires and the customer leaves.

Signal does not
respect walls.

If a reader sees tags it should not, the fix is usually the wall, not the reader. That holds well beyond retail.

Retail floors and stockrooms

Separating the sales floor from the back room, the fitting rooms and the tenant next door.

Hospital operating rooms

Keeping tracked instruments, implants and supplies scoped to the room they are actually in.

Warehouses and distribution

Dock doors, staging lanes and pick zones that bleed into each other and confuse the WMS.

Anywhere else you find it

Labs, secure storage, data halls. If it has walls and signal needs to be blocked, it applies.

We test it.
Then we prove it.

Nobody should pay to coat a wall on a hunch, or take our word that it worked.

Test first, onsite or remote

We read the space ourselves, or we work with the hardware provider you already have and take the results remotely. The crossings get mapped before anyone opens a can.

Coat only what needs it

Two shielding coats plus a finish coat, applied to the measured height, on the walls the test flagged. Billing runs on applied area, so you pay for what went on the wall.

Re-test to confirm

The same read test runs again after application, to confirm the bleed is actually resolved. You get a documented before and after for every site, not just a promise from the crew.

Every wall
has a record.

We built our own field system because nothing off the shelf tracked work at the wall level. It is how we run rollouts of 30,000 sq ft and up for international brands.

Measured off the plan

Every site is scaled and measured off the plan before anyone is scheduled. Walls get numbered and the footage is fixed in writing.

A print the crew can hold

A marked plan showing which walls, at what height, in what order. A code on the sheet opens the record.

Photos tied to the wall

Before and after shots attach to a numbered wall, not to a folder, so nobody has to work out later which surface a photo shows.

One board, everybody on it

The site lead works the checklist on a phone. Every check is timestamped and visible to you as it happens. Status never needs a call. Anything urgent still gets one.

Closeout, then invoice

Each site closes with the measured record, the marked plan, the photo index and a signed sheet. No closeout, no invoice. That rule is ours.

While we are
already onsite.

Shielding is the specialty. It is rarely the only thing a building needs after hours, and we self-perform the rest.

Specialty coatings

Epoxy and anti-static floors, chemical resistant finishes, safety striping.

Tech install

Low voltage, cabling, cameras, access control, signage, terminal wiring.

Racking and shelving

Back room racking, shelving and stockroom storage, set and secured to code.

Fixtures and finish

Fixture setting, punch list work and the trades that close out before you reopen.

Put a number
on the bleed.

A walkaway caused by a phantom count is a sale your system never records as lost. Set the numbers to your business.

$3,240,000
Sales lost every year across all locations

111 days
Payback per location on a one time treatment

Walkaways times ticket times 360 trading days. The treatment is paid once. The lost sales repeat every year the bleed stays.

Send us the site list.

We will come back with a measured scope, a schedule and a number.

pmo@continuumretail.com

Where we work

Delivered across the United States, Canada and Mexico. Europe and MENA coming soon.

Hours

Monday to Friday, 7:00 AM to 5:00 PM Central. Field crews run nights.

Office

13341 W Hwy 290, Bldg 2
Austin, TX 78737